Le Méridien FDDs
This page lists all 5 available Le Méridien Franchise Disclosure Documents (2015–2025), ready for immediate download after checkout. Franchisors must update their FDD annually, so reviewing several years side by side is the fastest way to spot trends before you commit.
From the 2025 Le Méridien FDD: “The total investment necessary to begin operation of a newly-constructed Le Méridien hotel, excluding the cost of real estate and related costs (building permit, tap, and impact fees), insurance, and contingencies, ranges from $84,358,740 to $138,214,140 for a 250-guestroom hotel.”
Available Le Méridien FDDs
Le Méridien
2025 Franchise Disclosure Document (FDD)
March 2025
Le Méridien
2018 Franchise Disclosure Document (FDD)
March 2018
Le Méridien
2017 Franchise Disclosure Document (FDD)
March 2017
Le Méridien
2016 Franchise Disclosure Document (FDD)
March 2016
Le Méridien
2015 Franchise Disclosure Document (FDD)
March 2015
Note: Purchased FDDs are delivered as instant PDF downloads. The Document Processing Fee covers acquisition, storage, organization, and digital delivery of the document.
